Home > Buy Now > Construction Machinery > Other Construction Machinery > Shield Back Fill Plant
 

Trade Ok
Member since 2009

Buma Engineering Co., Ltd.
 
icon Large Bore Pile Equipment
icon Diaphragm Wall Equipment
icon Shield Back Fill Plant

line

icon Company Profile
icon Bulletin Board
icon Guest Book
icon Index

line



visitors: 6420
 
Contact us
Buma Engineering Co., Ltd.
[Korea]
Address:
505 Deokam-ri, Juchon-myeon Gimhae-si Gyeongsangnam-do 621843 Korea
Phone:
82-55-3379891
Contact name:
Sangtae Lee , Director
Inquire now









Buma Engineering Co., Ltd.
 
Shield Back Fill Plant

Shield Back Fill Plant

Inquire now

Shield Back Fill Plant

Click to enlarge image


Description

SHIELD Method that is continuously insert the cylindrical machine into the vertical hole, rotate the cutter head, excavate a tunnel, prevent the wall from breakin down, establish a segment at the back of Shield Back Fill Plant, make a tunnel, and insert back fill into a segment. This machine contributes to the urban area as a basic equipment for waterworks, sewer system, electro communication cable, etc.


Related Keywords: shield back fill plant


Inquire now


Other products