Home > Buy Now > Construction Machinery > Other Construction Machinery > Hang grab
 

Trade Ok
Member since 2009

Buma Engineering Co., Ltd.
 
icon Large Bore Pile Equipment
icon Diaphragm Wall Equipment
icon Shield Back Fill Plant

line

icon Company Profile
icon Bulletin Board
icon Guest Book
icon Index

line



visitors: 6419
 
Contact us
Buma Engineering Co., Ltd.
[Korea]
Address:
505 Deokam-ri, Juchon-myeon Gimhae-si Gyeongsangnam-do 621843 Korea
Phone:
82-55-3379891
Contact name:
Sangtae Lee , Director
Inquire now









Buma Engineering Co., Ltd.
 
Diaphragm Wall Equipment

Hang grab

Inquire now

Hang grab

Click to enlarge image


Description

Hang Grab was properly designed for excavating soil continuously until it reaches in a certain depth providing bentonite in order not to let the wall break down and not to inflow underground water. The procedure of UNDERGROUND DIAPHRAGM WALL METHOD is that the soils are excavated continuously using Hang grab, and then reinforcing bar net is inserted and concretes are filled.


Related Keywords: desander , hang grab


Inquire now


Other products